After-sales Service: | Support |
---|---|
Material: | Calcium Silicate |
Usage: | Indoor |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
|
CALCIUM SILICATE INSULATION BOARD
|
||
Maximum Use Temperature (ºC )
|
1000
|
||
Chemical Composition (%)
|
(%)
|
||
SiO2
|
46-48
|
||
CaO
|
39-41
|
||
Al2O3
|
0.39-0.42
|
||
MgO
|
0.5-0.7
|
||
Color
|
White
|
||
Density (kg/m³)
|
230±10%
|
250±10%
|
270±10%
|
Modules of Rupture (MPa)
|
≥0.45
|
≥0.50
|
≥0.55
|
Compressive Strength (MPa)
|
≥0.75
|
≥0.85
|
≥0.95
|
Permanent Linear Shrinkage (%)
|
1000ºC x16h≤2.0
|
||
Thermal Conductivity (W/m·K)
|
|
||
100ºC
|
≤0.065
|
≤0.067
|
≤0.072
|
200ºC
|
≤0.075
|
≤0.077
|
≤0.082
|
400ºC
|
≤0.091
|
≤0.096
|
≤0.103
|
600ºC
|
≤0.132
|
≤0.136
|
≤0.138
|
1.What is the lead time?
It takes 4 weeks to get the MGO cement products fully cured.The cement products can still go curing in the containers if we ship them less than 4 weeks, but the curing condition on the ocean is not under control, which will effect the quality of the products. We strongly suggest you take the curing time into consideration when you place orders.
2.Can you make products as per our requests?
Of course, we accept OEM/ODM
3.What is your packaging?
Plywood plywood / or solid wood pallet
4.What is your payment term?
We arrange the production upon receiving your deposit by T/T. By TT or LC.
5.How about the samples?
Free samples with shipping cost.